Completion Date: 1997
Size: 13,000 sq. ft.
Construction Cost: $1.25 million

Temple B’nai Israel phase I consisted of renovating the existing building and adding a classroom wing. Included in the classroom wing are restrooms, an elevator and classrooms to support study, preschool, and daycare services. The two story addition was completed and the phase II gymnasium began soon after.

Phase II consisted of the addition of a gymnasium. The brick faced block building is used for preschool events, summer camps, and basketball leagues throughout the year.

Phase III brought about the addition of a 100-seat chapel. The chapel is designed for services, weddings and small private events. The chapel is a unique space capped off by an artistic array of frosted panels backlit with a computerized lighting system. The panels provide an endless array of color possibilities and are visible any time of the day. An acoustical engineer was consulted to ensure the highest level of sound quality within the space.